Friday, May 27, 2011

This tile was laid with a Y, one section up the wet side of the drive and the other up toward the run off area of the roof.

After ditching we laid a 6" perforated drain tile and covered it with rock.


Notice how deep the skid steer is in the mud. This is what we are trying to get rid of. First, we scooped out all the sloppy material until we got down to something more firm. We then created a ditch across the from of this deck, sloping down hill, across the driveway.


Notice the Sloppy, Muddy mess in the bottom left of this photo. There is seepage from up the hill that has been seeping into this area all spring. This mess extended across the entire deck of the house. In an effort to keep the interior clean, having new floors, and start to dry out the site we needed to address this seepage.

Finally, the decks start going in!