Camp Bayfield
Thursday, December 16, 2010
gas install
Electric install
Slab
Foam, Plumbing, Sump pit Under slab
Thursday, December 9, 2010
Pouring the Walls
Tuesday, December 7, 2010
Drain tile and drain rock
Footings poured and covered up and back to bed. See you in the morning.
Bring the truck, Lets pour!
Covered and cozy, forms ready for concrete
Sorry I got caught up in the dig and did not get any photos until these forming the footings.
Found them, both water and sewer!
Digging to the street for water and Sewer hook-up. That 4x4 will lead to the sew line.
First we pull off the top soil to save for later, and wow there was lots of topsoil!
This is a bit of a dreary day but, what a view!
The future site of Camp Bayfield and preparation for the excavation